Wall Street Creek Restoration

wall-street-slyvia-dane-bridge-view

Funding Received: $1.5 million
Project Timeline: Anticipated construction in June 2017
Project Status: RFP posted; In progress for permits;

This project aims to stabilize the creek channel, address bank erosion, remove sediment where necessary and revegetate a dense residential area of Fourmile Canyon.  Significant degradation as a result of past disasters (fire and flood) have caused repeated damage and risk to public and private property. Project goals include increasing safety, reducing flood risk, protecting infrastructure and restoring and improving natural habitat within and along the creek. Draft design documents available:

  • Designs – click here
  • Construction Specification – click here
  • 30% Design Memorandum – available on request due to large file size