Lower Ingram Gulch Implementation

Lower Ingram Gulch Implementation

INGRAM GULCH Funding Received: $1,473,612 Project Timeline: Fall/Winter 2017 Project Status: In process Ingram Gulch off of Gold Run Road is a steep, confined, and burned gulch with a legacy of hard rock mining all resulting in high water flows and significant debris flows during disasters. This implementation project is to address channel stabilization, erosion control through vegetation, and floodplain capacity in the lower gulch. Final Design Plans: click here E-mail Us 303-449-3333 STAY IN TOUCH: Name Email Address Message Message 12 + 10...
Black Swan Restoration

Black Swan Restoration

BLACK SWAN RESTORATION Project Timeline: Summer 2017 Project Status: 30% desing complete; In permitting process This project aims to stabilize the creek channel, address sediment deposition from fire and flood, and increase floodplain capacity where necessary. Project documents available for review include: Project Area Map: click here 30% Draft Designs: click here Design Memorandum: click here HEC RAS (2014): click here Updated Hydraulic Model (2016): click here Boulder County Road Design: click here Boulder County Logan Mill Bridge Design: click here Heat Maps / Proposed Grading Version 1: click here Version 2: click here E-Mail Us 303-449-3333 STAY IN TOUCH: Name Email Address Message Message 2 + 3...
Wall Street Creek Restoration

Wall Street Creek Restoration

Wall Street Creek Restoration Funding Received: $1.5 million Project Timeline: Slated for Late Fall Completion Project Status: In construction This project aims to stabilize the creek channel, address bank erosion, remove sediment where necessary and revegetate a dense residential area of Fourmile Canyon.  Significant degradation as a result of past disasters (fire and flood) have caused repeated damage and risk to public and private property. Project goals include increasing safety, reducing flood risk, protecting infrastructure and restoring and improving natural habitat within and along the creek. Draft design documents available: Designs – click here Construction Specification – click here E-mail Us 303-449-3333 STAY IN TOUCH: Name Email Address Message Message 5 + 11...
Ingram Gulch Planning

Ingram Gulch Planning

Ingram Gulch Planning Funding Received: $165,000 Project Timeline: Winter 2016/2017 Project Status: In process Ingram Gulch off of Gold Run Road is a steep, confined, and burned gulch with a legacy of hard rock mining all resulting in high water flows and significant debris flows during disasters. This planning study is to evaluate mine waste remediation strategies, analyze debris stabilization strategies, sample water and soil quality, and assess macroinvertebrate activity. View the project overview map here. View the community meeting presentation here. Other project documents: 30% Design Plans: click here Design Report: click here Debris Flow Maps: click here E-mail Us 303-449-3333 STAY IN TOUCH: Name Email Address Message Message 9 + 4...
Resilient Crossings Guidebook

Resilient Crossings Guidebook

Crossings Guidebook Funding Received: $175,000 Project Timeline: Fall 2017 Project Status: Guidebook out to print! This is a multi-watershed project with Coal Creek, St. Vrain, and la Pourde River coalitions aimed at creating a culvert and crossings handbook demonstrating resilient design and construction practices. Guidebook link coming soon! E-mail Us 303-449-3333 STAY IN TOUCH: Name Email Address Message Message 13 + 10...